1998 Mitsubishi Montero Specs, MPG & Trims

EPA fuel-economy data and specifications for the 1998 Mitsubishi Montero (15–16 MPG combined) across 3 listed configurations.

Overview

Body class
Special Purpose Vehicle 4WD
Drive
4-Wheel or All-Wheel Drive
Engine
6-cyl, 3.0 L; 6-cyl, 3.5 L
Fuel type
Regular Gasoline
Combined MPG
15–16 MPG
Annual fuel cost
$4,200–$4,450
Configurations
3

MPG & fuel economy

City, highway and combined values below are EPA estimates. Where a powertrain has several configurations, the table shows the lowest–highest reported value. Electric configurations use MPGe.

EPA city, highway and combined ratings by powertrain for the 1998 Mitsubishi Montero. Electric configurations are rated in MPGe.
PowertrainCityHighwayCombinedAnnual fuel costCO2
6-cyl 3.0 L · Regular Gasoline · 4-Wheel or All-Wheel Drive14–1517–1815–16$4,200–$4,450—
6-cyl 3.5 L · Regular Gasoline · 4-Wheel or All-Wheel Drive141816$4,200—

Configurations & engine comparison

Each row is one configuration/engine combination reported by the EPA for this model year. Missing EPA values are shown as —.

Every EPA-listed configuration for the 1998 Mitsubishi Montero (3 rows). "Configuration" is the EPA configuration/engine name.
Configuration / engineDriveTransmissionCyl.Displ. (L)Fuel typeCityHwyComb.Annual cost
Montero4-Wheel or All-Wheel DriveAutomatic 4-spd63.0Regular Gasoline151816$4,200
Montero4-Wheel or All-Wheel DriveAutomatic 4-spd63.5Regular Gasoline141816$4,200
Montero4-Wheel or All-Wheel DriveManual 5-spd63.0Regular Gasoline141715$4,450

Frequently asked questions

What is the combined MPG of the 1998 Mitsubishi Montero?

According to EPA data, the 1998 Mitsubishi Montero is rated at 15–16 MPG combined for its conventional-fuel configurations.

How many cylinders does the 1998 Mitsubishi Montero have?

The EPA data lists 6 cylinders for this vehicle.

What fuel type does the 1998 Mitsubishi Montero use?

It uses Regular Gasoline.

What is the annual fuel cost of the 1998 Mitsubishi Montero?

The EPA estimates annual fuel costs ranging from $4,200 to $4,450.